Watford Gap Services (M1 J16–J17)
Watford Gap sits on the M1 between Junction 16 and Junction 17 in Northamptonshire. It is run by Roadchef, and it opened on 2 November 1959 — the day the M1 opened.
The name is a real place, and it is not the Watford you are thinking of
The Watford Gap is a genuine geological pass, and within a corridor about 400 metres wide it carries the Roman Watling Street, the Grand Union Canal, the West Coast Main Line and the M1. The phrase “north of Watford” is often said to mean this Watford rather than the Hertfordshire one at Junction 5, seventy miles south — though which of the two the saying originally meant has never actually been settled. There is a site on each carriageway, linked by a footbridge. Drivers still call it the Blue Boar, after the original operator.
Search all the latest M1 traffic news
Latest accident or incident on the M1
The most recent accident or incident on the M1 that we are aware of.
Latest active roadworks on the M1
Roadworks live on the M1 right now.
M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)
05:19 (5:19am)15 Oct 2026reported 8 min ago
- Location
- M1 northbound within J10
- Direction
- Northbound
- Lanes closed
- Hard shoulder closed
- Reason
- Construction work
- Schedule
- 02:35 (2:35am) Thu 23 July 2026 → 05:00 (5am) Sat 24 Oct 2026
+ 5 more active roadworks - search all M1 traffic news →
Latest planned roadworks on the M1
The next planned roadworks scheduled on the M1.
M1 northbound Approach to Jct 6 lane 3 and 2 closure
05:19 (5:19am)15 Oct 2026reported 8 min ago
- Location
- M1 northbound between J5 and J6
- Direction
- Northbound
- Lanes closed
- Lane closures
- Reason
- Roadworks
- Schedule
- 22:00 (10pm) Thu 15 Oct 2026 → 05:00 (5am) Fri 16 Oct 2026
Forecast - not confirmed
+ 29 more planned roadworks - search all M1 traffic news →
Road closed — on the overhead signs now
National Highways’ overhead signs are showing a road closure, as at 05:27 (5:27am) Thu 15 Oct 2026.
M1 J25-J26 CLOSED
Time now: Thursday, 15 October 2026, 05:27 (5:27am)04:33 (4:33am)15 Oct 2026set 53 min ago✓ Checked by us 05:27 (5:27am)
M1 J25-J26
CLOSEDOverhead Message
WhereM42 northbound, at J9 · on 1 signAlso onAlso showing on M42 signsSinceSet 04:33 (4:33am) Thu 15 Oct 2026We check these overhead signs at least every five minutes, but we can't guarantee a sign is still current if an incident or issue has been cleared and the sign has not been updated yet. Signs and news can each carry something the other does not - check both before you travel.
Search all the latest M1 traffic news
Updated 05:27 (5:27am) Thu 15 Oct 2026
Powered by National Highways’ Transport Data Feeds.
What is at Watford Gap Services
- Food and drink, both sides: McDonald’s, Costa, Chozen, Krispy Kreme
- Northbound also: Chaiiwala — its first ever motorway site — Coco di Mama and Fresh Food Café
- Southbound also: LEON and Garden Square Deli
- Shops: WHSmith on both sides
- Fuel and charging: BP Express forecourts; GRIDSERVE Electric Highway, nine bays northbound and eighteen southbound, up to 350kW
- Hotel: Days Inn, southbound side
- Lorries: HGV parking on both sides
Two hours free, then £21 for a car and £37 for an HGV, or £40 with a £12 food voucher.
Service area details are compiled from the operators’ own published information and were last checked on 14 September 2026. Facilities change — if something here is out of date, please tell us and we will correct it.
The traffic around Watford Gap Services
The services sit on the stretch between Junction 16 and Junction 17, which the Department for Transport counts at 120,092 vehicles a day — the 22nd busiest of the 42 measured stretches of M1 mainline. Of those, 22,231 are lorries, 18.5% of the traffic. That is the highest lorry share anywhere on the M1 — nearly one vehicle in five. In April 2026 Roadchef announced a £300m investment and 75-year lease extensions covering both sides of Watford Gap.
Traffic figures are Department for Transport road traffic statistics, annual average daily flow for 2025, both directions combined.