⚠ NEW
M1 Traffic

M1 Traffic News

0Accidentsnone in National Highways’ incident data — but the overhead signs show M1 J25-J26 CLOSED — see the signs6Roadworks activelive on the M1 right now — see details30Plannedscheduled on the M1 — see details

Live M1 traffic data from National Highways · updated 05:27 (5:27am) Thu 15 Oct 2026

M1

Watford Gap Services (M1 J16–J17)

Watford Gap sits on the M1 between Junction 16 and Junction 17 in Northamptonshire. It is run by Roadchef, and it opened on 2 November 1959 — the day the M1 opened.

The name is a real place, and it is not the Watford you are thinking of

The Watford Gap is a genuine geological pass, and within a corridor about 400 metres wide it carries the Roman Watling Street, the Grand Union Canal, the West Coast Main Line and the M1. The phrase “north of Watford” is often said to mean this Watford rather than the Hertfordshire one at Junction 5, seventy miles south — though which of the two the saying originally meant has never actually been settled. There is a site on each carriageway, linked by a footbridge. Drivers still call it the Blue Boar, after the original operator.

Search all the latest M1 traffic news

Latest accident or incident on the M1

The most recent accident or incident on the M1 that we are aware of.

No accident is listed in National Highways’ incident data for the M1 right now, but the overhead signs are showing: M1 J25-J26 CLOSED. See the overhead signs.

Latest active roadworks on the M1

Roadworks live on the M1 right now.

  • M1 northbound Jct 10 to Jct 11 hard shoulder closure (MP 49/4 to 49/6)

    Active nowRoadworksNorthbound
    Time now: Thursday, 15 October 2026, 05:27 (5:27am)

    05:19 (5:19am)15 Oct 2026reported 8 min ago

    Location
    M1 northbound within J10
    Direction
    Northbound
    Lanes closed
    Hard shoulder closed
    Reason
    Construction work
    Schedule
    02:35 (2:35am) Thu 23 July 2026 → 05:00 (5am) Sat 24 Oct 2026
    ⏳Long-term works - HA planned end: 05:00 (5am) Sat 24 Oct 2026.
  • + 5 more active roadworks - search all M1 traffic news →

    Latest planned roadworks on the M1

    The next planned roadworks scheduled on the M1.

  • M1 northbound Approach to Jct 6 lane 3 and 2 closure

    PlannedRoadworksNorthbound
    Time now: Thursday, 15 October 2026, 05:27 (5:27am)

    05:19 (5:19am)15 Oct 2026reported 8 min ago

    Location
    M1 northbound between J5 and J6
    Direction
    Northbound
    Lanes closed
    Lane closures
    Reason
    Roadworks
    Schedule
    22:00 (10pm) Thu 15 Oct 2026 → 05:00 (5am) Fri 16 Oct 2026

    Forecast - not confirmed

    🚧HA scheduled: 22:00 (10pm) Thu 15 Oct 2026 → 05:00 (5am) Fri 16 Oct 2026 starts in about 17 hours · lasts ~7h 00m
  • + 29 more planned roadworks - search all M1 traffic news →

    Road closed — on the overhead signs now

    National Highways’ overhead signs are showing a road closure, as at 05:27 (5:27am) Thu 15 Oct 2026.

    • M1 J25-J26 CLOSED

      On the signs now Road closed
      Time now: Thursday, 15 October 2026, 05:27 (5:27am)

      04:33 (4:33am)15 Oct 2026set 53 min ago✓ Checked by us 05:27 (5:27am)

      M1 J25-J26
      CLOSED

      Overhead Message

      WhereM42 northbound, at J9 · on 1 sign
      Also onAlso showing on M42 signs
      SinceSet 04:33 (4:33am) Thu 15 Oct 2026
      We check these overhead signs at least every five minutes, but we can't guarantee a sign is still current if an incident or issue has been cleared and the sign has not been updated yet. Signs and news can each carry something the other does not - check both before you travel.

    See all the M1 overhead signs

    Search all the latest M1 traffic news

    Updated 05:27 (5:27am) Thu 15 Oct 2026

    Powered by National Highways’ Transport Data Feeds.

    What is at Watford Gap Services

    Two hours free, then £21 for a car and £37 for an HGV, or £40 with a £12 food voucher.

    Service area details are compiled from the operators’ own published information and were last checked on 14 September 2026. Facilities change — if something here is out of date, please tell us and we will correct it.

    The traffic around Watford Gap Services

    The services sit on the stretch between Junction 16 and Junction 17, which the Department for Transport counts at 120,092 vehicles a day — the 22nd busiest of the 42 measured stretches of M1 mainline. Of those, 22,231 are lorries, 18.5% of the traffic. That is the highest lorry share anywhere on the M1 — nearly one vehicle in five. In April 2026 Roadchef announced a £300m investment and 75-year lease extensions covering both sides of Watford Gap.

    Traffic figures are Department for Transport road traffic statistics, annual average daily flow for 2025, both directions combined.

    M1traffic.co.uk is dedicated to the latest M1 traffic news, checked every five minutes, 24 hours a day. The M1 meets the M25 at Junction 6a — see M25 Traffic, and Traffic News England for traffic news across all of England.